Paving installation
in Aberdeen
Here is the order of work, from the first phone call to the last brush.
- Site visit, quote and plan
- Dig, base, fall and edge
- Clear-up before we leave


The dig and the base
Everything soft comes out, down to ground that does not give. Hard stone goes back in layers, each pressed down before the next, and a thick, well-packed base keeps a surface flat through freeze and thaw. Where the ground is wet, we add depth.

Laying, jointing and finishing
The surface goes on last. Slabs are set on a bed and tapped to level, with a fall away from the walls. Blocks are laid in the chosen pattern, cut at the edges and pressed down. Joints are filled and the edge restraint fixed so nothing can creep.

Weather, noise and the neighbours
Hard frost, a long downpour or strong wind can stop work, because bedding must set and slabs need dry material. We would rather leave a gap than lay on a bad day.
On a terrace or a close we also think about the neighbours: where the skip and the pallets go, and the hours the plate compactor runs.
Installation questions
How long will a patio take?
That turns on the size, the slope and the weather. We give a figure once we have seen the plot.
Will you take away the old surface?
Ring and ask.
Do I need to be at home?
It helps on day one, to agree levels and edges. After that you can come and go.
Who deals with the dropped kerb or road permit?
The council's roads team decides, and the owner normally applies.
What happens if it rains?
We stop when it would harm the work and pick up when the weather allows.
How do I start?
Phone 01224 927157, or put your postcode in the short form.